Two-Phase Flooring at a Henan Industrial Park
A Henan industrial park was built in two phases. The floor concrete in both phases used a 44 mm recycled macro synthetic fibre. The recorded project dosage was 3 kg/m³, with approximately 40 tonnes used across the two phases.