Category: Case Studies

Explore concrete fibre projects in tunnels, precast concrete, industrial floors and inland waterways. See the products used and the documented project conditions.

Wide view of an indoor industrial concrete floor

Context reference — Wide view of an indoor industrial floor.

November 23, 2026

Two-Phase Flooring at a Henan Industrial Park

A Henan industrial park was built in two phases. The floor concrete in both phases used a 44 mm recycled macro synthetic fibre. The recorded project dosage was 3 kg/m³, with approximately 40 tonnes used across the two phases.

Read more
Indoor concrete floor under construction between columns

Process reference — Indoor concrete floor under construction.

November 23, 2026

Concrete Base Layer for an Underground Car Park in Shanghai

An underground car park at a residential development in Shanghai used 50 mm Twist Wave fibre in the concrete base layer, with decorative stone panels installed above it. The recorded project dosage was 5 kg/m³, and approximately 50 tonnes of fibre were used.

Read more
Close-up of a fresh concrete surface before final finishing

Process reference — Close-up of fresh concrete before final finishing.

November 23, 2026

Guangzhou Airport Terminal Underground Car Park

The underground car park works at an airport in Guangzhou used Twist Wave 50 with a mineral-aggregate wearing finish. The recorded dosage was 5 kg/m³ and the underground car park works used approximately 80 tonnes of fibre.

Read more
Concrete structure, formwork and temporary supports beside an inland waterway

Project video still — waterside concrete structure construction along the works.

November 23, 2026

Shandong Inland Waterway Works

Within the confirmed supply scope for this case, 48 mm High Strength synthetic fibre was used in concrete for dock floor areas, related concrete structures and components, and slope-protection works along the waterway. The recorded total supply across these locations was approximately 70 tonnes.

Read more
Column grid and roof structure inside a steel-framed industrial building

Context reference — interior of a steel-framed industrial building.

November 23, 2026

Composite Slabs on Profiled Steel Decking

This application group focuses on composite slabs in multi-storey steel-framed industrial buildings. Conchip has supplied 50 mm Twist Wave fibre, and the related project records commonly show an application dosage of approximately 2.5 kg/m³. This is lower than the 4–8 kg/m³ starting trial range stated in the Twist Wave 50 product data for industrial flooring. The approximately 2.5 kg/m³ figure describes these recorded applications. Similar work should verify dosage against the actual deck profile, concrete mix and project design requirements.

Read more
Stacks of precast concrete segments
November 20, 2026

Wuhu GIL Utility Tunnel | Custom 40 mm Fibre

For specification leads on power utility tunnels, the Wuhu 500 kV GIL project illustrates how a custom 40 mm fibre requirement can be carried from the approved specification to delivery and precast segment records.

Read more