Application-first concrete fibre engineering[email protected] · WhatsApp +86 159 6543 3989
Conchip Solution

Precast Tunnel Segments

Fibre selection and verification across segment production, demoulding, handling, installation and service.

Follow the whole segment lifecycle

Review automatic weight dosing, dispersion, mixing time and production repeatability first. Then define early-age and demoulding requirements, lifting and storage conditions, transport damage controls, TBM thrust and installation actions, dimensional tolerances, gasket and joint performance, and service-stage design.

Verify the component

Plant trials and the specified material or full-scale component tests must reflect the actual mix, geometry and production process. Fibre selection cannot compensate for unverified joint, gasket, curing or handling design, and any reinforcement change requires qualified structural approval.

Next step

Send the real project conditions.

Share the application, process, equipment, mix, proposed dosage, required method, quantity and destination. Conchip will respond within the evidence currently available.