INDUSTRIAL FLOORING

Fibres for industrial floors.
From how the floor is used
to how it is placed and finished.

Loads, joints, mix, placing and finishing belong in the same flooring discussion.

Designers: check service requirements first ↓
Industrial concrete floor surfaceService conditions → mix trial → placing / finishing → project verification
Application image; not evidence of a Conchip project.
START WITH THE FLOOR

Start with service conditions.
Not with a promised steel saving.

Slab design and joint layout are the project designer's responsibility. This page helps prepare fibre-evaluation information; it does not specify slab thickness, reinforcement or a fixed substitution ratio.

A / SERVICE AREAB / JOINT CONDITIONSC / SURFACE REQUIREMENTSDiscussion diagram only; not a slab-thickness, joint or reinforcement design
  • How will the floor be used?

    Factory, warehouse or another use; vehicles, racking, wear and project-specified service requirements.

  • What is the slab and joint arrangement?

    Provide the existing slab thickness, subbase, joints and design information. Identify unresolved details rather than asking the fibre supplier to invent a design.

  • What surface is acceptable?

    Finishing method, visible fibres, coatings and subsequent treatments should be checked together during the trial pour.

  • How will acceptance be assessed?

    Crack-control targets, specified residual performance and other project criteria. Confirm the method, specimen preparation and acceptance conditions first.

PLACING & FINISHING

Adding fibres to the mixer
does not finish the construction task.

These are trial-pour recording points, not substitutes for site operating, curing or joint-cutting procedures.

  1. Mix trial: check dispersion and workability

    Record the actual mix, dosage to evaluate, mixer and dosing method. Check dispersion; successful addition alone does not establish acceptable performance.

  2. Placing: record actual transport and discharge conditions

    Check site transport, pumping / discharge and spreading. Trials should represent the proposed production and construction conditions as closely as practicable.

  3. Finishing: include the surface requirements

    Record finishing, surface condition and subsequent coating needs. Acceptance follows the project agreement; no claims of "zero exposed fibres" or "never cracks" are made.

  4. Review: consider performance, appearance and records together

    Follow the project plan for curing, joints and acceptance. Record site observations separately from specified tests for the responsible party to assess.

FIBRE TO EVALUATE

Check product identity first.
Then verify project performance.

This is a priority candidate for this application, not a final recommendation independent of the conditions. The product page is the source for full specifications and controlled documents.

Twist Wave 50 actual product photograph
Product name as stated in the formal TDS

Twist Wave 50

Polypropylene / polyethylene blend; 20 twisted flat monofilaments with longitudinal grooves and no surface embossing. A candidate for project evaluation in flooring.

Standard length
50 mm
Equivalent diameter
0.60 mm
Tensile strength
≥570 MPa

These are nominal TDS fibre specifications, not site concrete, component or support-performance results. Source: TDS Rev. 20260701.

TDS suggested starting range: 4–8 kg/m³.Confirm final dosage through project design, mix and actual process trials. Dosage alone does not establish energy absorption, residual strength or finished-product performance.

This product's PE bag
must not enter the mixer.

Twist Wave 50 uses ordinary PE bags of 2 kg each. Open and remove the bag before dosing; it is not water-soluble film packaging. Carton: 12 kg; pallet: 504 kg. Source: TDS Rev. 20260701.

Dose by mass, not by guessing a bag count.

TDS: add fibres with the concrete materials in the normal dosing sequence. Continue mixing for 3–5 minutes after addition, or until uniform dispersion is confirmed. Check actual loading, timing and dispersion in plant trials.

Mass calculation · not a dosage recommendationFibre mass per batch = V × D
V
Concrete volume per batch (m³)
D
Project-confirmed trial dosage (kg/m³)
The result is in kg. D must be confirmed through project design, mix and testing. The formula does not predict floor performance or automatically recommend a number of bags.
EVIDENCE & ACCEPTANCE

Fibre tensile strength
does not establish the floor's residual performance.

Connect design requirements, trial-pour conditions and test records to create a reviewable basis for selection.

Confirm the method with the project

EN 14651 provides relevant beam-test method context. For polymer-fibre-only projects, also confirm the test plan accepted by the project. A method name is not product certification.

The TDS does not declare residual strength

Twist Wave 50 nominal monofilament specifications cannot be used to calculate floor residual strength, a slab-thickness reduction or a steel-fibre substitution ratio.

Record more than one observation

Retain product batch, mix, dosage, mixing and placing conditions, finishing observations, curing and the source of specified tests.

Laboratory boundary

Conchip operates a factory-internal laboratory; it is not accredited. Internal data support comparison and project discussion. Arrange independent third-party testing when accredited evidence is required.

Related public case studies

These cases describe individual projects. Laboratory measurements are listed separately in the test database.

BUYER QUESTIONS

Address the questions
that change selection.

Do fibres remove the need for joints or curing?

No. Joints, curing, subbase and structural arrangements must follow project design and construction requirements. Fibres do not automatically remove these requirements.

Can you guarantee a crack-free floor?

No crack-free guarantee is made. Define the control target and acceptance criteria, then evaluate them through mix trials, trial pours and specified tests.

What does the batching plant need for the first trial?

The formal product name, proposed trial mix, mass calculated from volume and dosage, packaging instructions, equipment and trial-pour plan. Highlight that the ordinary PE bag must be removed.

A USEFUL FIRST INQUIRY

Bring the floor's service requirements
into the first mix trial.

Send the information available and mark unresolved conditions. Continue through Project / Technical Inquiry.

Send application and project conditions

Review the information → current TDS / SDS and method information → missing items and trial discussion. Response timing and the records available must be confirmed separately.

  1. 01Use, vehicle / racking design loads and existing design information
  2. 02Slab thickness, subbase, joints and surface / coating requirements
  3. 03Mix, transport, pumping / spreading and finishing conditions
  4. 04Dosage to evaluate, trial area, specified method and acceptance conditions
  5. 05Trial quantity, supply destination, timing and document needs

Distribution / import: check documents and supply conditions.

Twist Wave 50: ordinary PE bag 2 kg, carton 12 kg, pallet 504 kg. Do not confuse this with water-soluble film bundles. Confirm shipment packaging, labels, destination, quantity and purchasing schedule individually. Stock and lead time are not assumed.

Distributor / Importer Inquiry →

Technical procurement: include your specification.

List the formal product name, required document version, application, trial quantity and supply quantity. Product pages retain the controlled TDS / SDS links rather than duplicating conflicting document versions across applications.

Start a specification-led project inquiry → Trade sourcing route →