Concrete Base Layer for an Underground Car Park in Shanghai How the concrete beneath decorative stone panels was selected

An underground car park at a residential development in Shanghai used 50 mm Twist Wave fibre in the concrete base layer, with decorative stone panels installed above it. The recorded project dosage was 5 kg/m³, and approximately 50 tonnes of fibre were used.

Discuss base-layer samples and a site trial
Indoor concrete floor under construction between columns
Process reference — Indoor concrete floor under construction.
Twist Wave fibre
50 mm
Base-layer project dosage
5 kg/m³
Project quantity
Approx. 50 tonnes

From sample submission to product selection

The project was designed by a design institute, and the flooring subcontractor contacted the supplier. Conchip first provided a product test report for Twist Wave 50 and fibre samples. The subcontractor completed a site trial before the product was formally selected.

When reviewing the trial area, the first step is to confirm which layer contains the fibre. The product named in the test report should then be matched to the supplied fibre and the trial mix. Base-layer thickness, level and any crack-control criteria should be checked against the project requirements. The decorative stone finish should be assessed against its own installation and acceptance records.

  1. Product test report and fibre samples
  2. Site trial
  3. Product selection

Product and technical resources

Twist Wave 50 product test report JCBG(01)250205945 · Test standard GB/T 21120-2018

Discuss base-layer samples and a site trial

Share the car park floor build-up and base-layer requirements for a discussion about samples and a site trial.