Shandong Inland Waterway Works Fibre supply records by construction location
Within the confirmed supply scope for this case, 48 mm High Strength synthetic fibre was used in concrete for dock floor areas, related concrete structures and components, and slope-protection works along the waterway. The recorded total supply across these locations was approximately 70 tonnes.
Submit requirements by construction locationAreas supplied
- Concrete dock floor areas
- 3 kg/m³
- Related concrete components
- 5 kg/m³
- Slope-protection works
- Dosage to be confirmed
- High-strength synthetic fibre
- 48 mm
- Recorded total supply
- Approx. 70 tonnes
Dosage by area
| Area of work | Project dosage |
|---|---|
| Concrete dock floor areas | 3 kg/m³ |
| Related concrete components | 5 kg/m³ |
| Slope-protection works | Dosage to be confirmed |
Project dosage and trial range
The dock floor dosage of 3 kg/m³ is a project record. The High Strength 48 product data gives 4–8 kg/m³ as a starting trial range for precast concrete. Dosages for similar work depend on the concrete mix, performance and acceptance criteria for each area.
Trace the supply record by area
Where one fibre product is used in different locations, the concrete mix, dosage and acceptance requirements should be traced to the corresponding scope of work. This page therefore keeps the dock-floor and component dosages separate and identifies the slope-protection dosage as still requiring confirmation.
Official information provides general background on inland-waterway and port construction in Shandong. The fibre dosages on this page are stated from the project records for the listed locations.
Product and technical resources
Submit requirements by construction location
Send the concrete mix, quantity and material requirements for each construction location.