Rail precast plant production leads

Xiyi S2 Taihu Tunnel From 10 kg fibre bags to a precast plant trial

For rail precast plant production leads, the Xiyi S2 specification gives a starting point for trial batching: one high-strength fibre, 48 mm long, 0.95–1.00 mm in diameter and packed in 10 kg bags.

Pallets of bagged fibre being loaded onto a vehicle
General Conchip dispatch photograph. Bag specifications below are for the Xiyi S2 project.

Project specification

The Xiyi S2 Taihu tunnel section is 21.6 km long. The Section 09 precast line makes internal curved units for the tunnel base and central partition walls that separate the two tracks.

Xiyi S2 special precast component production → Jiangsu provincial project coverage →
One High Strength fibre
48 mm
Project diameter
0.95–1.00 mm
Packing
10 kg per bag

Prepare the first batches around the actual equipment

Checks to adapt to a comparable project.

  1. Confirm the labelled bag weight and check how the fibre opens and feeds into the batching equipment.
  2. Calculate the fibre mass per batch from the approved dosage and actual concrete volume, then weigh it for addition.
  3. Link the fibre batch, actual weight, feed sequence, mixing time and observed dispersion to the component type and production batch.

Evidence and technical resources

The bag weight describes the supply unit. The plant sets dosing from its mix design. During a trial, record fibre opening and distribution separately from fresh concrete behaviour and the finished surface.

Factory laboratory reference

Conchip retains internal trials with their mix and test conditions as a reference for future selections.

View internal precast trial records →

Discuss a precast plant trial

Share the component type, mixer, batch volume and intended fibre feed method.