Rail precast plant production leads
Xiyi S2 Taihu Tunnel From 10 kg fibre bags to a precast plant trial
For rail precast plant production leads, the Xiyi S2 specification gives a starting point for trial batching: one high-strength fibre, 48 mm long, 0.95–1.00 mm in diameter and packed in 10 kg bags.
Project specification
The Xiyi S2 Taihu tunnel section is 21.6 km long. The Section 09 precast line makes internal curved units for the tunnel base and central partition walls that separate the two tracks.
Xiyi S2 special precast component production → Jiangsu provincial project coverage →- One High Strength fibre
- 48 mm
- Project diameter
- 0.95–1.00 mm
- Packing
- 10 kg per bag
Prepare the first batches around the actual equipment
Checks to adapt to a comparable project.
- Confirm the labelled bag weight and check how the fibre opens and feeds into the batching equipment.
- Calculate the fibre mass per batch from the approved dosage and actual concrete volume, then weigh it for addition.
- Link the fibre batch, actual weight, feed sequence, mixing time and observed dispersion to the component type and production batch.
Evidence and technical resources
The bag weight describes the supply unit. The plant sets dosing from its mix design. During a trial, record fibre opening and distribution separately from fresh concrete behaviour and the finished surface.
Factory laboratory reference
Conchip retains internal trials with their mix and test conditions as a reference for future selections.
View internal precast trial records →Discuss a precast plant trial
Share the component type, mixer, batch volume and intended fibre feed method.